Intel blueshirt again after they have failed to roll out 7nm transistor CPU by year 2023!
This time they promised to roll out 30A (3nm) CPU by year 2025! (1nm = 10A (Angstrom); 1A is about the diameter of a hydrogen atom.
At present, AMD is already on 5nm transistor CPUs!